200 tph of construction waste mobile crushing in Jilin

200 tph of construction waste mobile crushing in Jilin
Project Description

Applicable material:construction waste

Outlet size:0-5,5-20,20-40mm

Scope of application:highway, railway, construction engineering, etc.

Processing capacity:200T/H

Project Benefits

The customer is a building material technology company in Jilin, which is engaged in solid waste recycling project. With the continuous development of human society, a large amount of solid waste is generated which occupying a lot of land and causing pollution of the ecological environment. Among urban solid waste, construction waste has accounted for 30% to 40% of the total amount of urban waste, which has become an important problem faced by construction companies and environmental protection departments.

For crushing construction waste, Mecru Crawler Crushing Station is a good helper. Considering the large number and scattered distribution customer projects, in order to control production costs, at the same time take into account the practicality of the equipment, and obtain a higher return on investment, after many comparisons, the customer finally chose to purchase our company's crawler jaw crushing station.


The advantage of project


1.Short cycle time and low cost

Due to the complex site environment, scattered raw materials and short construction period, the integrated unit design of the mobile crushing station can avoid long-term equipment infrastructure, and to a certain extent, shorten the project cycle and reduce investment costs.

2.Advanced equipment and high efficiency

The crawler jaw crusher is equipped with advanced jaw crusher, optimized crushing cavity shape and unique motion characteristics, which makes the crushing station have higher processing efficiency. Once crushed, the yield is high, the output is large, and the adjustment is also convenient.


3.Flexible and mobile

Crawler jaw crusher can be quickly transferred, put into production quickly, and return quickly! Especially suitable for large-scale high-speed high-speed rail temporary stockyard, construction waste treatment plant, mixing plant incoming material processing project, etc.


4.Economic and environmental protection, cost reduction and efficiency increase

The mobile crushing production line does not require equipment infrastructure. Naturally, it also avoids the demolition work after the project completed, which is more economical and environmentally friendly. In addition, the mobile crushing production line has a wide range of applications. Investors can quickly put into operation new projects, or sell discounts to reduce investment costs.

Related products

Customer Reviews

During the project cooperation, Mecru has always been responsible and professional, due to their rich practical experience. From scheme design, equipment selection, to technical training, all aspects of Mecru are well done. After the construction waste production line is put into use, it has been running well. Not only is the crushing efficiency high, the output is large, but it can be transferred at any time, making the construction site on-site crushing a very simple matter.

※ Please Contact Us for your specific application – We provide solutions for each application.

Inquire Online

We promise that all your information will be kept confidential. Please be assured to complete these information. It is just for our sales manager to contact you accordingly.